26 July 2024
PDF - 5.50 MBGood operational performance of the Group’s main mining activities in H1 2024 (vs. H1 2023): +33% in manganese ore volumes produced (vs. H1 2023), with a return to normal operating conditions +40% in nickel ore volumes produced in Indonesia; albeit with -20% in volumes sold, reflecting the absence of low-grade saprolite sales’ permit +33% [...]
25 July 2024
PDF - 960.51 KB5 July 2024
PDF - 292.72 KB5 July 2024
PDF - 122.54 KB3 July 2024
PDF - 1.33 MBStart of the commissioning of the Centenario direct lithium extraction plant, located in Salta Province, Argentina; first production planned in November 2024A key milestone in Eramet’s strategic development into producing metals for energy transitionA technological achievement at 4,000 m of altitude, implementing at industrial scale one of the most advanced Direct Lithium Extraction (‘DLE’) process, [...]
3 July 2024
PDF - 226.91 KB
Publications & press releases2024-06-07T17:56:36+02:00